The kitchen radiator project (
phase 1 without shelves or covering the pipe) went fairly smoothly. As I mentioned previously, Mike actually built both the half bath and kitchen radiator covers at the same time. He cut the pieces, made sure everything fit properly, then primed and painted everything.
For the top cover, Mike had to cut out a divot to accommodate for the pipe. This will be covered up long term by the box that will cover the pipe in phase 2.
Even Georgia got in on the action and "helped." (
And don't worry, those power tools she was sniffing around were unplugged!)
No comments:
Post a Comment