It's been like two weeks... or has it been three? No matter - the closets are finally patched! Between all the electrical work (lights!), the giant holes from the electrical work, existing cracks and crumbling plaster - it was a ton of slow work. Mike put up lots and lots of thin layers, letting each coat dry in between so the patches wouldn't fall down. Seriously it's taken forever with all the drying time and sanding. And the dust! There's been so much dust! But now, finally, we can prime and paint and start to put things back together.
Feb 25, 2011
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment